Last Updated: 2010-12-09

Mission

The Jahnke Road website will be updated continuously throughout the life of the project and provide a format for citizens to remain informed of project progress. It is our hope that the website will encourage City residents to provide their valuable input for the planned improvements to the Jahnke Road Corridor between Blakemore Road and Forest Hill Avenue.

Project Goals

We want to improve traffic safety, improve traffic flow and enhance overall livability for the residents and users of the Jahnke Road Corridor. Jahnke Road not only carries automobile traffic, but also pedestrians, cyclists, GRTC bus riders and children that attend the three public schools located along the Project corridor.

Important project elements within the design will include bicycle lanes, sidewalks, landscaping and lighting. The existing roadway drainage will be upgraded from an open system with roadside ditches to a closed system with storm sewer pipe and curb and gutter which will eliminate areas slow to drain during prolonged periods of heavy rainfall.

Planned Outreach

Activities will provide city residents with meaningful opportunities to affect project outcomes throughout the project. Please take the opportunity to access the website links and review the first project newsletter (in a series of periodic newsletters) and information on the upcoming public information meeting. We also encourage citizens to provide initial thoughts, comments and ideas about the Jahnke Road Improvement Project at any time under the Contact link.

Project Team

Design Consultant Team

The City of Richmond selected CH2M HILL as the prime consultant for the design phase of the Jahnke Road Improvement Project in December of 2008. CH2M HILL is an engineering firm located within the City of Richmond at 8720 Stony Point Parkway, Suite 110, Richmond VA 23235. CH2M HILL initiated the project with the mobilization of the design team to begin the information gathering process of the Jahnke Road Project Corridor. A right-of-entry letter was released to the residents that lived along the Jahnke Road Corridor in early February 2009 requesting permission to access properties in order to assemble accurate data for project design.

Additional Information

Project Timeline and Anticipated Construction Schedule

The city of Richmond awarded the Project to CH2M HILL, the design consultant December, 2008.

Planning and design began in early 2009 with initial engineering studies that included surveying, traffic data gathering and analysis, and environmental studies.

The first public information meeting was held in July, 2009 to introduce the Project to the residents of the area and other interested citizens. The meeting was held to obtain feedback on possible design alternatives.

The second public information meeting was held in mid October, 2009. Results from the first and second public information meetings finalized the selection of a preferred alternative to carry forward to final design.

The Public Hearing will introduce the preferred alternative to carry forward to final design. This option is based upon citizen input and feedback from the previous public information meetings, and the results of the preliminary engineering studies.

Next steps will include the completion of final design and the acquisition of any right-of-way or permanent and temporary easement in early 2011.

Project construction is pending based upon receipt of additional funds. Current funding is available for engineering and right-of-way acquisition only.

Traffic Volume and Accident Information

Citizens at the previous public information meetings expressed interest in understanding the existing and future traffic volumes and the number, type and history of accidents that occur on Jahnke Road. The table below summarizes information on the existing and projected traffic counts and accident history from 2005 through 2010 on the project.

Jahnke Road Project Corridor
Traffic Volumes and Accident Information Summarized by Year

YearAverage
Daily Traffic
Accidents
200612,00038
200711,00032
200811,00039
200912,35026
201012,35017
203017,350

Traffic volumes are measured as Average Daily Traffic (ADT), which is the number of vehicles passing thru the Jahnke Road Project Corridor during a 24 hour period. Counts for 2006 through 2008 were provided by Virginia Department of Transportation

From 2006 through September 2010, there were a total of 152 accidents with the largest increase seen at the intersection of Jahnke Road and Blakemore Road.

Contact Information:

Dept of Public Works
City of Richmond
900 E. Broad St., Suite 704
Richmond, VA
23219 USA
Map It
Hours: Monday -Friday
8 a.m. - 5 p.m.
Customer Care Center: 3-1-1

311

Logo for 311

If you have any questions, please call the City’s Customer Care Center at 3-1-1 or (804) 646-7000

Visit our Twitter Page

This is a print version of the webpage. The navigation of the site has been removed through the print css. If you require a printout of the page as it looks in your browser, please use screen capture.